4.3

Out of 2 Ratings

Owner's of the ADC Clothes Dryer AD-170SE gave it a score of 4.3 out of 5. Here's how the scores stacked up:
  • Reliability

    4.0 out of 5
  • Durability

    4.5 out of 5
  • Maintenance

    4.5 out of 5
  • Performance

    4.5 out of 5
  • Ease of Use

    4.0 out of 5
of 58
 
19
The ductwork should be smooth inside with no projections from sheet metal screws or other obstructions,
which will collect lint. When adding ducts, the duct to be added should overlap the duct to which it is to be
connected.
ALL ductwork joints must be taped to prevent moisture and lint from escaping into the
building. Inspection doors should be installed at strategic points in the exhaust ductwork for periodic
inspection and cleaning of lint from the ductwork.
NOTE: When the exhaust ductwork passes through a wall, ceiling, or roof made of combustible
materials, the opening must be 2-inches (5.08 cm) larger than the duct (all the way around).
The duct must be centered within this duct.
a. Outside Ductwork Protection
1) To protect the outside end of the horizontal ductwork from the weather, a 90° elbow bent downward
should be installed where the exhaust exits the building. If the exhaust ductwork travels vertically
up through the roof, it should be protected from the weather by using a 180° turn to point the
opening downward. In either case, allow at least twice the diameter of the duct between the duct
opening and the nearest obstruction.
IMPORTANT: DO NOT use screens, louvers, or caps on the outside opening of the exhaust
ductwork.