19
DIRECT VENT INSTALLATION REQUIREMENTS
Follow the guidelines in the “HORIZONTAL INSTALLATION
REQUIREMENTS” section for the exhausting of flue
products.
IMPORTANT
The labels in the Direct Vent Kit must be affixed to the boiler
in locations specified by the instruction sheet provided in
the kit. The following are requirements for the Air-Intake
Terminal(AIT):
1. TheAir-IntakeSystem(AIS)mustterminatewiththeventing
equipment pro vided with the boiler, Refer to the parts list for
required direct vent parts.
2. TheAITshallnotbelocatedlessthan3feet(1.0m)below
anyexhaustventwithin10feet(3.0m),see “HORIZONTAL
INSTALLATIONREQUIREMENTS”section.
3. The total horizontal distance of the AIS from the boiler’s Blower
Adaptertotheoutsideofthe“AIT”shallnotbegreaterthan70
“equivalent”feet(21.3m)ofventpipenorlessthan3feet(1.0m),
excluding elbows. A maximum of 3 elbows, equiva lent to 10 feet
(3.0m)eachofpipemaybeused.
For all side wall terminated, horizontally vented power vent, direct vent, and power direct vent gas fueled water heaters installed
in every dwelling, building or structure used in whole or in part for residential purposes, including those owned or operated by
theCommonwealthandwherethesidewallexhaustventterminationislessthanseven(7)feetabovenishedgradeinthe
areaoftheventing,includingbutnotlimitedtodecksandporches,thefollowingrequirementsshallbesatised:
INSTALLATION OF CARBON MONOXIDE DETECTORS At the time of installation of the side wall horizontal vented gas fueled
equipment,theinstallingplumberorgasttershallobservethatahardwiredcarbonmonoxidedetectorwithanalarmandbatteryback-up
isinstalledontheoorlevelwherethegasequipmentistobeinstalled.Inaddition,theinstallingplumberorgasttershallobservethat
a battery operated or hard wired carbon monoxide detector with an alarm is installed on each additional level of the dwelling, building
or structure served by the sidewall horizontal vented gas fueled equipment. It shall be the responsibility of the property owner to secure
theservicesofqualiedlicensedprofessionalsfortheinstallationofhardwiredcarbonmonoxidedetectors.
In the event that the side wall horizontally vented gas fueled equipment is installed in a crawl space or an attic, the hard wired
carbonmonoxidedetectorwithalarmandbatteryback-upmaybeinstalledonthenextadjacentoorlevel.
In the event that the requirements of this subdivision can not be met at the time of completion of installation, the owner shall
haveaperiodofthirty(30)daystocomplywiththeaboverequirementsprovidedthatduringsaidthirty(30)dayperiod,abattery
operated carbon monoxide detector with an alarm shall be installed.
APPROVED CARBON MONOXIDE DETECTORS Each carbon monoxide detector as required in accordance with the above
provisionsshallcomplywithNFPA720andbeANSI/UL2034listedandCSAcertied.
SIGNAGE Ametalorplasticidenticationplateshallbepermanentlymountedtotheexteriorofthebuildingataminimum
heightofeight(8)feetabovegradedirectlyinlinewiththeexhaustventterminalforthehorizontallyventedgasfueledheating
applianceorequipment.Thesignshallread,inprintsizenolessthanone-half(1/2)inchinsize,“GAS VENT DIRECTLY
BELOW. KEEP CLEAR OF ALL OBSTRUCTIONS.”
INSPECTION The state or local gas inspector of the side wall horizontally vented gas fueled equipment shall not approve the
installation unless, upon inspection, the inspector observes carbon monoxide detectors and signage installed in accordance
withtheprovisionsof248CMR5.08(2)(a)1through4.
EXEMPTIONS:Thefollowingequipmentisexemptfrom248CMR5.08(2)(a)1through4:
1.TheequipmentlistedinChapter10entitled“EquipmentNotRequiredToBeVented”inthemostcurrenteditionofNFPA54
as adopted by the Board; and
2. Product Approved side wall horizontally vented gas fueled equipment installed in a room or structure separate from the
dwelling, building, or structure used in whole or in part for residential purposes.
MANUFACTURER REQUIREMENTS - GAS EQUIPMENT VENTING SYSTEM PROVIDED When the manufacturer of Product
Approved side wall horizontally vented gas equipment provides a venting system design or venting system components with the
equipment, the instructions provided by the manufacturer for installation of the equipment and the venting system shall include:
1. Detailed instructions for the installation of the venting system design or the venting system components; and
2. A complete parts list for the venting system design or venting system.
MANUFACTURER REQUIREMENTS - GAS EQUIPMENT VENTING SYSTEM NOT PROVIDED When the manufacturer
ofaProductApprovedsidewallhorizontallyventedgasfueledequipmentdoesnotprovidethepartsforventingtheue
gases,butidenties“specialventingsystems,”thefollowingrequirementsshallbesatisedbythemanufacturer:
1.Thereferenced“specialventingsystem”instructionsshallbeincludedwiththeapplianceorequipmentinstallationinstructions;and
2.The“specialventingsystems”shallbeProductApprovedbytheBoard,andtheinstructionsforthatsystemshallincludea
parts list and detailed installation instructions.
A copy of all installation instructions for all Product Approved side wall horizontally vented gas fueled equipment, all venting
instructions, all parts lists for venting instructions, and/or all venting design instructions shall remain with the appliance or
equipment at the completion of the installation.
INSTALLATION REQUIREMENTS FOR THE COMMONWEALTH OF MASSACHUSETTS